![]() ![]() "During that meeting, I was clear about the expectations of Ottawa residents that we not only get the trains running safely, as soon as possible, but that we also fix the root causes," Sutcliffe told reporters. The return-to-service plan includes inspecting all 44 LRVs in the fleet, replacing the leading and trailing wheel hub assemblies and axles every 60,000 km and repositioning 16 restraining rails at eight locations along the LRT line. ![]() The mayor met virtually with officials from the manufacturer of the light-rail transit vehicles on day 19 of the shutdown of the LRT system after an axle-bearing issue was discovered on one train during a routine 50,000 km inspection. The information you need to know, sent directly to you: Download the CTV News App."There's no doubt in my mind that the people at Alstom are committed to delivering to Ottawa the safe, reliable system that we expect and deserve," Sutcliffe said on Friday, describing the meeting as "very productive." Mayor Mark Sutcliffe met with officials from Alstom to discuss short-term and long-term solutions for the light-rail transit system on Friday, as work continued to reposition the restraining rails with the goal to resume O-Train service on Aug. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |